Mega Bridge, Industrial Ring Road, Bangkok, Thailand - The four pylons of spectacular Mega Bridge in Bangkok rise 173 m into the sky. For the realization, the ACS climbing system ensured rapid construction process.

Mega Bridge, Industrial Ring Road, Thailand
Bangkok, Thailand

bridge connection as part of the Industrial Ring Road IRR over the Chao Phraya river, motorway junctions lie in the middle

  • construction: two cable-stayed bridges
  • length: 702 m and 582 m
  • height of the four pylons: 173 m and 164 m
  • span width: 326 m and 398 m
  • construction period: until 2006

 

 

Location
Main Application
Civil Engineering
Project participants
Customer: TNNS Joint Venture: Taisei, Nishimatsu, NKK, Sino Thai

The Project

Impressions from the project process
Mega Bridge, Industrial Ring Road: Akira Mihashi, Project Manager und Hirobumi Kono, Site Manager
Mega Bridge, Industrial Ring Road: Akira Mihashi, Project Manager und Hirobumi Kono, Site Manager
Akira Mihashi | Hirobumi Kono
Project Manager | Site Manager
The PERI formwork solution made a substantial contribution to the successful realisation of this project. The formwork adapted superbly to the changing cross-sections and different inclinations.  High work-rate was achieved as a result of the safe and convenient work processes provided by the PERI ACS self-climbing formwork.

Related Products

Are you working on a project like this?

Contact us – we will be happy to help you.
Mega Bridge, Industrial Ring Road, Bangkok, Thailand - The four pylons of spectacular Mega Bridge in Bangkok rise 173 m into the sky. For the realization, the ACS climbing system ensured rapid construction process.
Mega Bridge, Industrial Ring Road, Bangkok, Thailand - The four pylons of spectacular Mega Bridge in Bangkok rise 173 m into the sky. For the realization, the ACS climbing system ensured rapid construction process.